Case Study2022
Red Bull Soundclash
Capturing the energy of 2 stages and 15,000 fans.
Watch Showreel
15kCrowd
2Stages
150mWire Cam
110Decibels
Client
Red Bull Egypt
Scope of Work
Live CoverageMusic
Credits
- WupY-PS Team
01. The Challenge
Two stages facing each other.
Two stages facing each other. Audio levels peaking at 110dB. We needed to capture the artist interaction across the gap.
02. The Execution
Cable-cams (wire cams) running between the two stages to give the viewer the perspective of the sound moving back and forth.
03. The Impact
"The "flying shot" became the most shared asset of the entire festival."
Next Case Study
MENA Climate Summit
View Project